|
|
|
|
|
|
|
|
|
|
|
Home > Projects & Programs > Call for Projects
Metro is responsible for allocating discretionary federal, state and local transportation funds to improve all modes of surface transportation. Metro also prepares the Los Angeles County Transportation Improvement Program (TIP). A key component of TIP is the Call for Projects program, a competitive process that distributes discretionary capital transportation funds to regionally significant projects.
Every other year, Metro accepts Call for Projects applications in seven modal categories. Local jurisdictions, transit operators, and other public agencies are encouraged to submit applications proposing projects for funding.
Metro staff ranks eligible projects and presents preliminary scores to Metro’s Technical Advisory Committee (TAC) and the Metro Board of Directors for review. Upon approval, the TIP is developed and formally transmitted to the regional and state transportation planning agencies. The TIP then becomes part of the five-year program of projects scheduled for implementation in Los Angeles County.
Project sponsors are required to either execute a Letter of Agreement (LOA) for projects being funded with State or Federal funds, a Transit LOA, or a Memorandum of Understanding (MOU) for those funded with local sales tax dollars.
The LOA or MOU must be executed in the first year that funds are available and prior to starting any work on the project. They include a general description of the project and the specific work elements to be completed, the source of all funds that will be used to complete the project and the project’s cash flow.
The tabs above provide the LOA and MOU boilerplate agreements and necessary attachments, contact information and other reference documents.
(Memorandum of Understanding)
|
Name |
Description |
|
MOU Letter of No Prejudice for Prop C Funds |
|
|
MOU Agreement for Prop C Funds |
|
|
MOU Attachment A – Project Funds |
|
|
MOU Attachment C – Scope of Work |
|
|
MOU Attachment D – Administrative Guidelines |
|
|
MOU Attachment D1 – Quarterly Report |
|
|
MOU Attachment E – Tip Sheet |
|
|
MOU Attachment F – Special Conditions Check Board Report and include projects specific conditions |
|
|
MOU Local Attachment F1 Special Conditions ITS Certification |
MOU Attachment F1 – Certification Form Use only for Sponsoring Agency Self-Certification |
|
MOU Attachment F2– Special Conditions Use only for Signal Sync. Projects |
|
|
MOU Amendment for Prop C Funds |
|
Mode |
Eligible Projects |
|
Regional Surface Transportation Improvements |
Major capital improvements and goods movement projects on regionally significant arterial highways which improve traffic flow and reduce congestion such as: arterial widening, bottleneck intersection improvements, closure of gaps in the arterial system, grade separations, and other arterial improvements. Project must be on the public right-of-way. Rehabilitation, Reconstruction and Repavement (3R) are eligible as a component of a larger capacity enhancing project. |
|
Signal Synchronization & Bus Speed Improvements |
Traffic signal synchronization, transit preferential treatment and priority systems, bottleneck intersection improvements, traffic control and monitoring systems, and Intelligent Transportation System (ITS). |
|
Transportation Demand Management (TDM) |
Technology and/or innovation based strategies, Ridesharing Incentive/Disincentive Programs, Parking Management Programs, Transportation Facilities Amenities, Commuter Service Centers, and New and Unique Capacity Enhancing Demonstration Projects. |
|
Bikeways Improvements |
Regionally significant projects that provide bicycle access and mobility through bike-to-transit improvements, gap closures in the inter-jurisdictional bikeway network, bicycle parking, and first-time implementation of bike racks on buses. |
|
Pedestrian Improvements |
Pedestrian improvements that promote walking as a viable form of utilitarian travel, pedestrian safety, and an integral link within the overall transportation system. |
|
Transit Capital |
Bus capital, improvements or construction of transit stations, transit centers and park and ride lots, commuter rail projects, transit stop improvements and transit vehicle purchases. |
|
Transportation Enhancements Activities |
Acquisition of scenic or historic sites, scenic or historic highway programs, landscaping and scenic beautification, historic preservation, rehabilitation of historic transportation buildings, control and removal of outdoor advertising, archeological planning and research, environmental mitigation to address water pollution due to highway runoff, safety and educational activities for pedestrian and bicyclists, reduction of vehicle caused wildlife mortality and establishment of transportation museums. |
|
Modes Category |
Modal Lead Contact |
Contact Number |
| Regional Surface Transportation Improvements |
Walt Davis |
213.922.3079 |
|
Signal Synchronization and Bus Speed Improvements |
Randy Lamm |
213.922.2470 |
| Transportation Demand Management |
Rufina Juarez |
213.922.7405 |
|
Bikeway Improvements |
Lynne Goldsmith |
213.922.3068 |
| Pedestrian Improvements |
Tham Nguyen |
213.922.2606 |
|
Transit Capital |
Larry Torres |
213.922.3050 |
|
Transportation Enhancements |
James Rojas |
213.922.2451 |
|
ITS Policy |
Peter Liu |
213.922.2813 |
|
Parking Policy |
Robin Blair |
213.922.3074 |
|
Federal Transportation Improvement Program |
Herman Cheng |
213.922.2453 |
|
Nancy Marroquin |
213.922.7237 |
|
|
State Program |
Toye Oyewole |
213.922.7404 |
(Letter of Agreement)
|
Name |
Description |
|
LOA Federal CMAQ RSTP Funds |
|
|
LOA Agreement for CMAQ and RSTP Funds |
|
|
LOA Attachment A – Project Funds |
|
| LOA Federal Attachment C Project Funds | LOA Attachment C – Scope of Work |
| LOA Federal Attachment D Administrative Guidelines | LOA Attachment D – Administrative Guidelines |
| LOA Federal Attachment D1 Quarterly Report | LOA Attachment D1 – Quarterly Report |
| LOA Federal Attachment E TIP Sheet | LOA Attachment E – Tip Sheet |
| LOA Federal Attachment F Caltrans Document List |
LOA Attachment F – Caltrans Document List |
| LOA Federal Attachment G | LOA Attachment G –Special Conditions |
| LOA Federal Attachment G1 Special Conditions ITS Certification |
LOA Attachment G1 – Certification Form |
| LOA Federal Attachment G2 Special Signal Conditions |
LOA Attachment G2– Special Conditions Use only for Signal Sync. Projects |
| LOA Federal Amendment | LOA Amendment for CMAQ and RSTP Funds |
| LOA State RIP TE Funds | |
| LOA State Agreement RIP TE | LOA Agreement for RIP and TE Funds |
| LOA State Attachment A Project Funds | LOA Attachment A – Project Funds |
| LOA State Attachment C Bike Scope | LOA Attachment C – Bike Scope |
| LOA State Attachment C Project Funds | LOA Attachment C – Scope of Work |
| LOA State Attachment D Administrative Guidelines | LOA Attachment D – Administrative Guidelines |
| LOA State Attachment E TIP Sheet | LOA Attachment E – Tip Sheet |
| LOA State Attachment F CTC Guidelines | LOA Attachment F – CTC Guidelines |
| LOA State Attachment G Special Conditions |
LOA Attachment G – Special Conditions Check Board Report and include projects specific conditions |
| LOA State Attachment G1 Special Conditions ITS Certification |
LOA Attachment G1 – Certification Form Use only for Signal Sync. Projects |
| LOA State Attachment G2 Special Conditions |
LOA Attachment G2– Special Conditions Use only for Signal Sync. Projects |
| LOA State Amendment | LOA Amendment for RIP and TE Funds |
| LOA Transit CFP Funds | |
| LOA Transit Agreement CFP | LOA Transit Agreement |
| LOA Transit Attachment A Project Funds | LOA Attachment A – Project Funds |
| LOA Transit Attachment C Project Funds | LOA Attachment C – Scope of Work |
| LOA Transit Attachment D Administrative Guidelines | LOA Attachment D – Administrative Guidelines |
| LOA Transit Attachment E TIP Sheet | LOA Attachment E – Tip Sheet |
| LOA Transit Attachment F Special Conditions |
LOA Attachment F – Special Conditions Check Board Report and include projects specific conditions |
| LOA Transit Attachment F1 Special Conditions ITS Certification |
LOA Attachment F1 – Certification Form Use only for Signal Sync. Projects |
| LOA Transit Attachment F2 Special Conditions |
LOA Attachment F2– Special Conditions Use only for Signal Sync. Projects |
| LOA Transit Amendment | LOA Transit Amendment |
Receive email alerts when news and information is updated on this project.
Countywide Significant Arterial Network (CSAN) Maps
Call for Projects Information
Technical Call for Projects Information
Call for Projects Funding Information
Copyright © 2010 Metro - Los Angeles County Metropolitan Transportation Authority