Measure R Project Tracker


Here's how it works: The Measure R Projects Tracker lists the various projects in alphabetical order by category with a brief description of the project.1 You can view the status for many of the projects with estimated Measure R funding allocations as projected over 30 years.2

Filter through the various Measure R projects by clicking a criteria on the right. You can filter by project type or region. Project funding is represented in millions (M) or billions (B) of dollars.

Region: South Bay cities

Project Name & DescriptionFunding Status

Crenshaw/LAX Transit Corridor (project acceleration)*

Accelerates construction of a line along the Crenshaw Bl Corridor and connects Los Angeles, Inglewood, Hawthorne and El Segundo, plus unincorporated LA County.

Area(s): City of Los Angeles, South Bay cities
$1.21B Locally Preferred Alternative, December 2010

Regional Connector: Links Local Rail Lines*

Links four light rail lines that terminate at the edges of Central LA. Expected to provide seamless connections between Long Beach/Pasadena, and Culver City/East LA, minimizing the need for rail transfers.

Area(s): City of Los Angeles, Gateway Cities, San Gabriel Valley, South Bay cities, Westside cities
$160M Draft EIS/EIR, August 2010

South Bay Green Line Extension Corridor*

Continues the Metro Green Line from its current terminus in Redondo Beach to the South Bay Galleria.

Area(s): South Bay cities
$272M Environmental Study

Green Line Extension to Los Angeles International Airport*

Links the Metro Green Line to LAX at the Aviation Station.

Area(s): City of Los Angeles, South Bay cities
$200M Early Planning

  • *Specific mode and routing will be subject to approved plans developed in cooperation with local jurisdictions and affected communities.
  • **Specific improvements are expected to be developed by local jurisdictions.
  • ***Partial funding by public/private partnerships is assumed to be part of the project plan.

1Projects listed are for reference only and do not indicate priority order. Project definition depends on final environmental process.
2Measure R does not fully fund all projects.